Monday, 21 May 2018

LO1: Risk Assessment

DEVONSHIRE GREEN - RISK 

The Weather :  - This could be be a down fall because this is filmed outside so therefore if it rains we will need a backup plan otherwise a whole scene will need to be redone and this would delay the whole project.

- Un even ground: -  this could be a negative thing or an issue because we need to use a tripod to be able to focus the camera and stop it from the picture from being fuzzy. To stop this we will plan out exactly where about we are going to film.

The public : - Because we will be filming in a public space there will be a lot of background noise so therefore we will have to make sure the time that we plan the scene around a time that will not be too busy and there will not be a lot of distractions.

BEDROOM

Plugs and electric : - Make sure no liquids is around the plugs. Don't trip over the wires. 

Open windows for cigarette smoke 
Make sure you don't set anything/anyone on fire with the cigarette.


LEADMILL / A GIG VENUE 

People inside the gig - Could be a risk because there will be a lot of people in the venue so we will need to make sure that the camera does not get damaged when filming in a busy atmosphere.

Wires and objects - There will be barriers and wires around the venue so therefore we will need to be careful when walking around then venue.

The floor - The floor in the venue will be slippy because of people spilling drinks so therefore we need to make sure we are careful whilst walking around the venue.

People - The sound in the venue will be very loud so therefore we will need to plan our dialogue so that if there is any the audience need to be able to tell what the characters are saying.

Permission - We will need to gain permission from Leadmill to be able to film our scene in here.

OUTSIDE THE GIG VENUE

Whilst filming outside the gig venue we need to make sure that there is not a lot of background noise otherwise the audience will not be able to tell what the characters are saying. 

THE HOLT

We are going to ask for permission to film in this venue as it looks like a cool venue and one that would suit our   

No comments:

Post a Comment

LO4: Evaluation

Our brief for unit 5 was to create a short film for our unit 15, in this we chose to create a short film. Our short film was named Arden Sec...